vortied.blogg.se

Downside life supertall tower creaks
Downside life supertall tower creaks












downside life supertall tower creaks

Abramovich’s apartment several floors below the leak, causing an estimated $500,000 in damage, she said. Czarnecki said he was “not at liberty to comment.”Īfter the first incident, water seeped into Ms. Four days later, a “water line failure” on the 74th floor caused water to enter elevator shafts, removing two of the four residential elevators from service for weeks. 22, was caused by a “blown” flange, a ribbed collar that connects piping, around a high-pressure water feed on the 60th floor. There have been a number of floods in the building, including two leaks in November 2018 that the general manager of the building, Len Czarnecki, acknowledged in emails to residents. “That’s how I went up to my hoity-toity apartment before closing.” “They put me in a freight elevator surrounded by steel plates and plywood, with a hard-hat operator,” she said.

downside life supertall tower creaks

She was disappointed with her purchase on Day 1, she said, when she left her home in London in early 2016 to move into what she expected to be a completed apartment, and found that both her unit and the building were still under construction. Abramovich and her husband, Mikhail, retired business owners who worked in the oil and gas business, bought a high-floor, 3,500-square-foot apartment at the tower for nearly $17 million in 2016, to have a secondary home near their adult children. The construction manager, Lendlease, said in a statement that they “have been in contact” with the developers, “regarding some comments from tenants, which we are currently evaluating.” Macklowe Properties, the other developer, declined to comment. (Developers typically control condo boards in the first few years of operation.) “Like all new construction, there were maintenance and close-out items during that period,” they said. CIM Group, one of the developers, said in a statement that the building “is a successfully designed, constructed and virtually sold-out project,” and that they are “working collaboratively” with the condo board, which was run by the developers until January when residents were elected and took control.














Downside life supertall tower creaks